Precautions Foshan Steel Design

Time:[2016-6-15]  Hits:4645

Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
A Frame
⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
Room ⑵ column support resettlement
Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
⑶ roof and wall construction
Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
⑷ shear key
"CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
Means for positioning the column anchor ⑸
This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
Plan 2 steel structure
Select ⑴ steel building systems
Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
⑵ node Planning
Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
Else
In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
在线永久免费观看黄网站| 羞羞漫画_成人漫画_成人专用| 国产亚洲美女精品久久久久| 亚洲乱色伦图片区小说| 妺妺窝人体色www聚色窝欢迎| 成年丰满熟妇午夜免费视频| 无码人妻一区二区三区密桃手机版| 精产国品一二三产品99| 18禁裸乳无遮挡免费网站| 色婷婷五月综合丁香中文字幕| 国产亚洲精久久久久久无码7| 一二三四日本中文在线| 日本爆乳片手机在线播放| 国产精品一国产AV麻豆| 一二三四免费观看视频中国| 人人妻人人爽人人澡欧美二区| 国产精品自产拍在线18禁 | JZZIJZZIJ亚洲乱熟无码| 太平公主秘史在线观看免费| 精品久久人人爽人人玩人人妻 | 久久精品国产精品亚洲下载| HEYZO无码综合国产精品| 无码人妻一区二区三区免费 | 亚洲熟伦熟妇AV无码春| 人妻激情乱人伦视频| 国产男男Gay做受×Xx男| 岳潮湿的大肥梅开二度第三部最新| 日本JAPANESE猛男GAY| 国内精品久久久久影院日本| 47147人文艺术欣赏| 天天爽夜夜爽人人爽QC| 久久亚洲精品成人AV无码涩涩屋| 被老头侵犯的人妻| 亚洲成人无码一区| 欧美性战A久久久久久| 国产欧美日韩VA另类在线播放| 中文精品无码中文字幕无码专区 | 日本XXXⅩ69XXXX护土| 国产在线精品一区二区中文| 中文字幕亚洲无线码在线一区| 试看120秒男女啪啪免费| 久久久久亚洲AV成人无码网站 | 妺妺自愿做我的性玩具| 国产精品99久久免费观看| 又黄又无遮挡AAAAA毛片| 上课我穿超短裙被同桌摸出水| 久久99精品国产99久久| 成人影院YY111111在线| 亚洲色偷偷色噜噜狠狠99网| 日韩人妻无码一区二区三区综合| 精品中文字幕久久久无码中文Av| 插插射啊爱视频日A级| 亚洲乱码一区AV春药高潮| 人与动人物XXXX毛片在线播放| 精品国产福利在线观看| 被黑人猛男强伦姧人妻完整版| 亚洲精品国产精品乱码视色| 日本打扑克啪啪超爽网站| 久久成人无码专区| 顶级大但人文艺术视频 音乐| 亚洲最大AV网站在线观看| 色综合精品无码一区二区三区| 久久久久人妻一区二区三区VR| 公天天吃我奶躁我的比视频| 中国少妇内射XXXXX-百度| 无码人妻av免费一区二区三区| 内射人妻无码色AV麻豆去百度搜| 国产在线精品无码二区| 阿娇张开两腿实干13分钟完整版| 亚洲欧洲日产国码中文字幕 | 人妻AV中文字幕一区二区三区| 精品久久一区二区乱码| 从大树开始的进化漫画| 呦香8黝黝狖呦香8| 无码专区狠狠躁躁天天躁| 欧美黑人一级爽快片婬片高清| 黑人av巨大粗吊| 大家闺秀VS糙汉将军古言| 在线看片无码永久免费AV| 五月丁香六月狠狠爱综合| 欧美最猛黑人XXXX黑人猛交| 久久99精品久久久久久噜噜 | 啊轻点灬大巴太粗太长视频| 亚洲熟妇色XXXXXX爽| 偷拍 亚洲 卡通 另类 小说| 欧美丰满美乳XXⅩ高潮| 精品国品一二三产品区别在线观看| 成人片黄网站色大片免费观看CN| 孕妇特级毛片WW无码内射| 香蕉AV福利精品导航| 日本大片免费观看视频| 久久亚洲欧美日本精品| 国产一区二区三区在线观看免费 | 免费无人区一码二码乱码| 国内偷窥一区二区三区视频| 成年女人A毛片免费视频| 在小巷里被强高HNP| 亚洲AV永久精品无码| 色欲av伊人久久大香线蕉影院| 妺妺窝人体色www人体| 精品久久久无码中字| 国产高清在线a视频大全| WC女厕撒尿七Ⅴ偷拍| 永久黄网站免费视频性色| 亚洲av无码成人精品区在线观看 | 被黑人巨茎日出白浆的少妇 | 亚洲精品第一国产综合精品99| 天天大片天天看大片| 人妻少妇精品久久久久久| 麻豆成人久久精品二区三区免费| 国精产品一品二品国精日本| 夫妻免费无码V看片| JAVA强行VIDEOS| 在线观看亚洲区激情AV| 亚洲另类人妻小说| 性色AV一区二区三区人妻| 色欲ΑV一区二区三区天美传媒| 欧美高清精品一区二区| 看着领导挺进娇妻的体内电影| 极度另类FREESEX强行真实| 国产精品成人3p一区二区三区| 扒开校花的粉嫩小泬| 2019日韩中文字幕MV| 荫蒂添的好舒服视频囗交| 亚洲国产超清无码专区| 五月丁香六月缴情基地| 少妇人妻综合久久中文字幕| 人妻人妇人妻一区二区三区| 妺妺坐在我腿上勃起弄了应用 | 亚洲AV无码国产一区二区三区四| 偷拍精品视频一区二区三区| 日本猛少妇色XXXXX猛叫小说| 内射人妻无码色AV无码| 老头的大龟挺进秀婷小说| 久久99国产精品久久99| 黄a无码片内射无码视频| 国产免费无遮挡吸奶头视频| 国产成人最新三级在线视频| 厨房人妻HD中文字幕69XX| 啊灬啊灬快点灬用力岳| CHINESEHD国产精品麻豆| 16岁MACBOOKPRO日本| 中国少妇精品久久久久无码AV| 一本色道久久88精品综合| 亚洲日本乱人伦片中文| 亚洲精品国产AⅤ成拍色拍| 亚洲AV无码国产蜜桃麻豆| 亚洲AⅤ爽爽香蕉久久影片| 无码人妻丰满熟妇啪啪7774| 台湾MD豆传媒一区二区| 少妇性XXXXXXXXX色野| 日韩无矿砖2021中文字幕 | 美日韩AV成人影院| 老师在办公室被躁在线观看| 久久精品无码专区免费| 久久久久99精品成人片牛牛影视| 精品一区二区三区无码免费直播 | 久久99成人精一区二区三区| 精品无码人妻一区二区三区| 极品少妇的粉嫩小泬看片| 好男人日本社区WWW| 激情偷乱人伦小说免费看| 黑人玩弄漂亮少妇高潮大叫| 好男人影视在线观看下载| 狠狠色综合久久久久尤物| 狠狠躁夜夜躁人人爽天天天天| 黑人上司与人妻激烈中文字幕| 极品国产主播粉嫩在线观看| 极品教师高清免费观看| 精品无码无人网站免费视频| 精品久久久无码人妻中文字幕 | 国产精品久久久久久久稀缺资源| 国产精品免费高清在线观看| 国产嫖妓一区二区三区无码| 国产偷国产偷亚洲清高APP| 国产亚洲日韩网曝欧美台湾 | 国产AⅤ无码专区亚洲AV| 国产AV无码专区亚洲AV中文| 国产成人一区二区三区APP| 国产黄A三级三级三级| 国产裸拍裸体视频在线观看| 国产无遮挡又黄又爽又色| 河南妇女毛深深的沟WCD| 精品久久亚洲中文无码| 久久天天躁狠狠躁夜夜爽| 美女粉嫩饱满的一线天MP4| 内射骚妇高清AV电影| 强奷秘书吸乳免费观看| 日产乱码一二三区别免费看| 睡着了强行挺进岳身体| 无码人妻毛片丰滿熟婦区毛片色欲| 性少妇SEXVIDEOS高清| 亚洲成色WWW成人网站| 亚洲一区二区三区丝袜| 自拍亚洲综合在线精品| XXXX内射中国老妇| 顶级欧美熟妇高潮XXXXX| 国产精品免费精品自在线观看| 狠狠色丁香婷婷综合久久图片| 久久久久夜色精品国产明星|