Guangzhou Steel Structure Installation general steps (more detailed)

Time:[2016-4-6]  Hits:4817

Guangzhou Steel Structure Installation general steps (more detailed)

Guangzhou Steel installation general steps:
First, prepare the steel structure installation Guangzhou
(one). Ready to work
 1, the construction organization design and construction organization design of steel structure installation should provide a brief description of the project before, comprehensive statistical quantities, the correct choice of construction machinery and construction method, layout reasonable installation sequence, mainly installed elaborate technical measures, developed strict quality standards and safety installation standard, serious preparation of project schedules, workforce planning and materials supply plan.
 2. Check the pre-construction inspection of construction before the retest, including acceptance, construction equipment and measuring instruments and inspection of steel components based.
(1) Acceptance of Steel member steel members should be construction plans and specifications for acceptance. Steel member is transported to the site, the manufacturer shall provide factory certificate and the following technical documents:
 ① design and design modification documents;
 ② quality steel single or test report and supporting material;
 Test test data ③ high strength bolt friction coefficient;
 ④ plant one or two types of weld inspection reports;
 ⑤ steel members geometry inspection reports;
 ⑥ member list. Installation of this unit should be acceptance, and the actual condition of the structure retest. If the member is damaged in transit, require the production plant must be repaired.
(2) inspection before installation and construction equipment and measuring instruments for important hoisting machinery, tools, wire rope and other accessories shall be tested to ensure reliable performance have to ensure the smooth and safe installation. When installing the measuring instrument has to be regularly assigned to the National Bureau of Standards testing unit for testing, calibration, to ensure accuracy of the measurement standard.
 3, based retest. Steel is fixed in reinforced concrete base (base, capitals, corbels, etc.) on. Thus the base and anchor bolt accuracy, strength to retest. To retest the base level of the base surface elevation, roughness, horizontal position deviation anchors, anchor bolts embedded in the accuracy of the determination made. And the retest results and corrective require delivery of the base construction unit.
 4, preparation of installation plans and component supply plan, organize construction.
 5, check the steel components: Steel Factory member should have factory certification, drawings before installation press review enumeration member, the member is installed in accordance with the order arrived within the scope of the installation, without affecting the installation conditions as far as possible on the installation member lower position to ensure the installation convenience.
 6, installation of steel columns: first determine before lifting member hanging position to determine banding method, take appropriate precautions when lifting. After lifting steel columns when the column foot anchor bolt from about 30-40CM when righting the mounting bolt hole pedestal alignment, slow-fall in place. After the beginning of the school to be vertical deviation within 20MM, tighten the bolts temporarily fixed to decoupling.
 7, steel girder lifting: lifting steel beams after completion of the review column, lifting into place using two symmetrical banding installation hoisting steel beams. After lifting steel beams from the column reference plane 100MM slowly slowly in place, be adjusted to be corrected hoisting steel beams, then a fixed connection. With hanging with the theodolite corrected any time to correct deviations when hoisting steel beams.
 8, wall purlins installation: purlin cross-section smaller, lighter, and more using a hook or a hanging piece lifting method for lifting. Purlin correction is mainly the size and spacing of their own flatness. Check with the kind of pitch along the rod to move back and forth between the bar purlin members, subject to error, to relax or tighten the bolts corrected. Flatness ruler with cable and calibration checks, and finally bolted.
 9, the installation correction
 ①. Steel Column Correction: vertical steel columns correction theodolite or hanging wire hammer test, when the deviation is corrected using the jack, jack the base elevation correction a little elevation, and then increase or decrease the thickness of the plate, tightly immediately after the column foot correction is correct after solid anchor bolts, steel columns until the correct overall correction pouring fine stone concrete column under the soles of the feet fixed.
 ②. Steel Beam Correction: steel beams and vertical axis of the measurement correction, the correction performed using the jack, fixed immediately corrected.

 (two). Wall plate mounting pressure-type color
1. Preparation before construction
①, before the steel sheeting envelope construction and installation, custom corresponding construction drawings, and design and construction personnel training and production safety tests, according to the design documentation organization.
②, detailed check based on the file size and number of types of materials, damage to the pressure plate, flashing boards should be repaired and replaced.
③, various types of construction equipment should be complete, and can operate normally.
④, review and steel sheeting construction installation precision steel components relevant, clear coating installation weld spatter and purlins, and brushing the anti-rust paint for corrosion protection.
 2. Pressure-type color plate construction process: Siding installation by purlins from one location to start, must clenched between the board and the board, and then screws, drywall seams well water treatment. When the pressure plate is installed, it should be laid side edge to adjust its position, while fixed.
 (III). Floor bearing plate installation
 Before floor bearing plate construction, installation, drawing the appropriate row board diagram, according to the construction drawings. Pressure plate along one end of the floor to start laying, laying side edge to adjust its position, while fixed. Entrance case, install pressure plate, then cut the hole sizes according to the actual position of the hole.
 Second, the installation of steel Stability member monomer stabilization and structural overall stability
 1, the monomer component monomer stability stable member refers to a member at the site stack, from the pull, lifting, bending occurs in place during bending and torsion destruction and instability. Thus for thinner and larger member should consider this issue.
 2, the structure of the overall stability of the overall stability structure refers to the structure in the lifting process support system has not been formed, the structure must bear some of the load (including weight). Therefore, in the formulation of the lifting sequence must fully take into account this factor, to ensure that each step in the process of lifting the structure is stable. If the problem can be added other measures to resolve the temporary wind cable.
 Third, Guangzhou Steel installation and connection problems
 Live connection mainly ordinary steel bolts, high strength bolts connecting and welding.
 1, ordinary bolt connection, mainly used by ordinary bolt bending, pulling node. In the main bolt tension. Plus an appropriate prestressing, the shear structure are also used extensively for transmission towers and other connections. After ordinary bolt tightening, exposed threaded be not less than 2-3 button. Common locking bolt should measures, such as double-locking nuts or fastening nut. Bolt hole misalignment smaller reamer or rasp can be used to repair holes, gas cutting may not be used to repair holes.
 2, high-strength bolts, high strength bolts connecting ships directly for important structures to withstand dynamic loads in. Its main feature is to pass through the shear contact surface friction. Therefore, when high-strength bolts installed, practices and rough friction surfaces must be processed according to specifications. Secondly, also for the friction coefficient and torque coefficient test. When you install unscrew the torque to be measured at the beginning and end of the bolt screwing torque.
 3, site welding, site welding plant with welding inspection
 (1) the design of the site should be avoided in soldering
 (2) prevent the adverse weather conditions (rain, wind, cold climate) on construction
(3) reduce the adverse welding station (construction site operation can not rotate, only overhead welding, it is difficult to even settled welding personnel) influence in the process of lifting the steel should pay attention to the problem of the column, when the beam is installed, the main inspection horn column beneath the floor mat whether real, pad level, whether vertical column and the availability of displacement, the degree of vertical and lateral bending vector high primary and secondary beam. After the installation of steel structures formed spatially fixed unit and acceptance, it will require the construction unit in time and space column base plate top surface of the secondary concrete pouring compacting expansion. Finally, we need to check the verticality of the main steel structure and the whole plane bending

 Fourth, the preparation before lifting.
       When the manufacture of steel columns in the column axis design draw feet, on top of the cover shells on cross control lines, control and vertical axis of bolt installation quality control for lifting. Bolted steel construction for general use bolts and high-strength bolts. Ordinary bolts, each bolt end can not be more than two pads gaskets, not use gas cutting reamer bolt holes, bolts tightened after the exposed thread pitch of not less than 2; key control for high-strength bolts bolted rubbing treatment (sandblasted) , anti-slip surface friction coefficient, tightening sequences applied bolting, screwing early final twist, twist applied torque value, the value of the exposed threaded bolt, the gusset plate surface damage and deformation. Installation plate contact surfaces should be smooth, the contact surface must be greater than 75%, the edge of the gap is not greater than 0.8 mm, high-strength bolts should be free to penetrate not be beat and reaming; high-strength bolts shall not be used as a temporary installation bolt, bolt should one direction, bolt mounting every day should be a final twist is completed, a final twist after completion should be individually checked for less twist, super twist should be screwed up or replaced.
Steel Works important quality control points
Embedded quality embedded anchor bolts, anchor bolts directly affect the quality of the installation of steel structures, control bolt (group) position, squareness, length and elevation, and the reaming adjustment to reduce workload (even avoid rework), improve the structural quality of the installation is important. The method can be directly embedded anchor bolts embedded method may also be set aside hole method.
 Fifth, the steel works rainy winter construction measures
 (A) Construction in Winter
 1. Winter construction steel structure fabrication and installation of steel strictly enforced in accordance with the relevant provisions of Winter Construction.
 2. The steel components making positive temperature negative temperature installation should be considered when members shrinkage based on differences in ambient temperature, and adjust the deviation to take technical measures in construction.
 3. Participation negative temperature steel construction welders should be subject to a negative temperature welding technology training, examination, and obtain the corresponding certificate.
 4. The connecting material steel and related negative temperature used be accompanied by a certificate of quality, performance and product standards meet the design requirements.
 5. The negative electrode for use at a temperature more than two hours can not be exposed, more than two hours to re-baking electrode baking times no more than 3 times.
 6. flux prior to use in accordance with regulations baked to a moisture content of not more than 0.1%.
 7. The negative temperature high-strength bolts used shall have a product certificate, and at negative temperature coefficient of torque, axial force re-inspection.
 8. The negative temperature steel structure used coatings not use water-based paints.
 9. The next member feed, should be reserved for the shrinking margin, welding shrinkage and compressive deformation amount should be coordinated with the shrinkage of steel produced in the negative temperatures.
 10. member assembly, according to the order prescribed in the process from the inside out extended group fight, do weld shrinkage experimentally determined values ​​need to be reserved at the time of negative temperature group fight.
 11. component assembly, remove the seam 50mm memory remain rust, burrs, dirt, oil, snow and other debris, dry and free of residual moisture holding seams.
 12. The negative temperature should be at least 9mm steel plate welded to the multi-layer welding, weld surfacing from the bottom up layer by layer, each weld once finished welding, such as welding interruption before applying again to clear welding welding defects. Arc welding is prohibited on the base material.
 13. Steel-site installation, in case of snow or wind speed 6m / s or more, the erection of protective shed.
 14. eradicate substandard weld re-welding, steel welding process in accordance with the provisions under the negative temperature welding.
 15. When the ambient temperature is below 0 ℃, before brushing anticorrosive paint brushing process test, component surface rust, oil, burrs and other things necessary to clean up brushing clean, and keep the surface dry. Snow or ice may not work on brushing member.
 16. Winter transport, steel anti-slip measures taken when stacking, stacking space formation member firm no puddles, no freezing ground. When the same type of members are stacked, members should be kept level, horn on the same vertical line, and prevent slippery member.
 17. Installation according to claim former steel negative temperature conditions, their quality retest of the production and transportation of missed stacking member deformed, repair correction on the ground.
 18. Hoisting ropes should use anti-skid steel members plus septum, and at the same time lifting the gusset plate member, installers need to use the fixtures and other things with a rope lashing firmly.
 19. Preparation of steel components installation sequence chart according to the temperature conditions, in strict accordance with the provisions of the order will be installed during construction.
 20. Preparation installation of steel structures welding process, both ends of a member shall simultaneously be welded.
 twenty one. Before installing remove member surface ice, snow, dew, but not damage the coating.
 twenty two. Negative temperature installation of pillars, main beam immediately corrected permanently fixed position correction right now, the day of installation space member to form a stable system.
 23. The high strength bolt friction joint fitting member may not have snow ice surface, no contact with dirt, oil and other stolen goods.
 24. The negative temperature steel installation quality addition to complying with "Steel construction and acceptance norms" (GB50250-95) requirements, but also according to the design requirements for inspection and acceptance.
 (B) the rainy season construction measures
 1. Rain construction, erection of temporary protection should be shed, rain may not fall on a hot weld. The welding site is wet, wipe with a dry cloth and must be in before the welding with oxy-acetylene flame to dry, keeping the seams dry, no residual moisture.
 2. When lifting, the member if water should be cleaned before installation, but not damage the coating, high-strength bolts when fitting installation member friction surface should be clean, can not have drops, not rain and exposure to dirt and oil and other dirt.
 3. member rainy weather can not be brushing work.
 4. The rain and wind can not be more than five roof insulation construction.
 5. Because of the rain the air is moist, the electrode should be moisture storage and baked, repeat the same electrode baking times should not exceed twice by management in a timely manner grilled record.
 6. The case of windy weather, columns, beams, and other large supporting member should be corrected immediately, permanently fixed immediately after the position correction is correct, to prevent unilateral instability that day installation member, should form steric stabilization system.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
色综合色狠狠天天综合网| 欧美性猛交内射兽交老熟妇| AV男人在线东京天堂| 人妻无码精品一区二区| 国产成人国产在线观看| 亚洲AV成人无码一区二区在线观看| 精品国产A∨无码一区二区三区| 野花视频在线观看免费高清版| 男女啪啪吃奶GIF动态图| 波多野结衣高潮AV在线播放| 无码av无码免费一区二区毛片| 国偷自产视频一区二区久| 伊人久久大香线蕉AV色婷婷色 | 高潮喷奶水在线播放视频| 午夜夫妻试看120国产| 久久国产精品香蕉成人APP| 99国精品午夜福利视频不卡99| 色噜噜狠狠色综合成人网| 国产曰的好深好爽免费视频| 永久939W79W99W乳液| 人妻少妇中文字幕在线一区| 国产精品99久久久久久人| 亚洲乱妇熟女爽到高潮| 欧美丰满熟妇乱XXXXX视频| 高清一区二区三区免费视频| 亚洲成A人片在线观看你懂的 | 风流少妇又紧又爽又丰满| 亚洲AV永久纯肉无码精品动漫| 秘密列车动漫在线观看| 低调看JRS直播| 亚洲成在人线视AV| 欧美丰满熟妇乱XXXXX视频| 国产成人啪精品视频免费网站软件 | 亚洲AⅤ精品无码一区二区PRO| 久久婷婷综合色丁香五月| 宝贝真乖四人一起NP| 校园H学长含着粉嫩小奶| 乱无码伦视频在线观看| 俄罗斯VODAFONEWIFI| 亚洲国产精品成人午夜在线观看| 免费无码又爽又刺激聊天APP | 中国老太卖婬HD播放| 肉大捧一进一出免费视频| 极品教师第二季免费观看| 9L国产精品久久久久麻豆| 无码精品A∨在线观看无广告| 久久午夜伦鲁片免费无码 | 亞洲成AV無碼人在線觀看| 日本丶国产丶欧美色综合| 黑人粗大猛烈XXⅩXXBB| Chinese45丰满成熟HD| 性少妇VIDEOXXX欧美69| 男女性杂交内射妇女BBWXZ| 国产黄A三级三级三级| 伊人久久大香线焦AV色| 少妇被粗大猛进进出Va| 久久精品香蕉绿巨人登场| 大杳蕉在线影院在线播放| 亚洲欧洲AV综合一区二区三区| 人人添人人澡人人澡人人人人| 黑人干人三区亚洲| 锕锕锕锕锕WWW湿透了10秒| 亚洲国产成人无码网站大全| 人妻互换ⅩXXXBBBB| 好爽好大再深点高H免费观看| DIPTYQUE含羞草香薰| 亚洲AV无码专区色爱天堂老鸭窝 | 国产精品亚洲精品日韩已方| 征服丰满人妻老师| 天堂中文在线最新版| 麻豆亚洲AV成人无码久久精品| 国产成人欧美精品视频| 51FUN吃瓜网-热心群众| 亚洲AV成人综合网伊人| 青草久久久国产线免观蜜芽| 精品国产乱码久久久久久1区2区 | 护士HD老师FREE性ⅩⅩⅩⅩ| 把她送上一个又一个巅峰| 亚洲欧美日韩在线一区| 色播久久人人爽人人爽人人片AV | 色婷婷综合中文久久一本| 久久水蜜桃亚洲AV无码精品 | 久久人妻AV一区二区软件| 公交车上拨开少妇内裤进入| 真人做受试看120分钟小视频| 午夜18禁自慰JK爆乳网站| 欧美性猛尖ⅩⅩⅩⅩ乱大交| 皇上御花园HLH| 粉嫩少妇内射浓精VIDEOS| 中文字幕AⅤ天堂在线| 亚洲AⅤ日韩AV无码COM| 日本妇人成熟免费中文字幕| 久久久久亚洲AV无码观看| 国产精品久久一国产精品胖虎| 99RE6在线视频精品免费| 亚洲国产一区二区A毛片| 熟妇人妻无乱码中文字幕| 男男暴菊GAY无套网站| 娇妻被领导抱进卧室| 丰满老熟好大BBBBBB| 2014AV天堂网| 亚洲精品国产一区二区三区在线观| 色婷婷五月综合亚洲小说| 免费无码又爽又刺激高潮的动态图 | 亚洲高清国产拍精品熟女| 少妇粗大进出白浆嘿嘿视频| 免费无码午夜福利片69| 精品国产三级A在线观看| 国产成人精品一区二区三区无码| AV永久天堂一区二区三区| 亚洲五月丁香综合视频| 性XXXXX欧美极品少妇| 日韩精品无码一本二本三本| 奶头从情趣内衣下露了出来AV | 中文字幕人妻无码专区APP| 亚洲AV无码二区鸳鸯影院| 三个医生换着躁我一个| 妺妺窝人体色WWW美女| 久久99精品国产麻豆蜜芽| 国产精品原创巨作AV女教师| 成 人 黄 色 网站 小说 免| 最新中文AV岛国无码免费播放| 亚洲精品成人在线| 无码免费大香伊蕉在人线国产| 人人妻人人澡人人爽欧美一区双 | 国产成人亚洲精品无码青APP| JK白丝极品被CAO到流水呻吟| 野花香视频在线观看免费高清版| 亚洲AV成人片无码网站网一区| 少妇高潮惨叫久久久久久电影| 欧美性猛交乱大交3| 美女喷水一区国产| 久久国国产免费999| 国产一区二区三区在线电影| 国产成人无码AV在线播放无广告 | 亚洲精品无码日韩国产不卡Av | 欧美丰满熟妇XXXX| 乱码精品一卡2卡二卡三| 精品少妇爆乳无码av专用区| 国产日产欧产综合| 国产AV无码专区亚洲AⅤ| 被男狂揉吃奶胸60分钟视频| 99国精产品灬源码1| 中文无码熟妇人妻AV在线| 亚洲一区二区三区香蕉| 亚洲精品成人网站在线观看| 亚洲 日韩 欧美 成人 在线| 我和大佬的365天| 少女のトゲ在线观看动漫| 日本精品视频一区二区| 琪琪秋霞午夜AV影院| 女人浓毛巨茎ⅩXXOOO毛绒绒| 老赵抱着媛媛在厨房做| 久久精品国产亚洲AV麻豆| 精品国产麻豆免费人成网站| 哈昂~哈昂够了太多了动图| 国产美女遭强高潮网站| 国产大屁股视频免费区| 国产Chinese男男做受g片| 第一章少妇初尝云雨| 成 人免费 在线手机版视| 锕锕锕锕锕锕锕好疼JK漫画| A级毛片免费观看播放器| 1000部无遮挡拍拍拍免费视频 | 色综合热无码热国产| 日日天干夜夜狠狠爱| 日韩A级成人免费无码视频| 日本黑人乱偷人妻中文字幕| 人妻妺妺窝人体色WWW仙踪林| 欧美午夜理伦三级在线观看| 欧美人妖XXXX做受| 欧美VIDEOSGRATIS杂| 欧美丰满熟妇BBB久久久| 欧美大屁股流白浆XXXX视频| 欧美黑粗大在线观看| 欧美人与禽Z0ZO牲伦交| 欧美人与人动人物2020| 欧亚精品一区三区免费| 人妻精品AAAA中文字幕69| 热99RE久久国超精品首页| 人妻多毛丰满熟妇av无码| 人妻无码全彩里番ACG视频| 日本丶国产丶欧美色综合| 日韩系列中文无码| 色欲色AV免费观看| 特级毛片内射WWW无码| 无码人妻少妇伦在线电影| 性欧美18-19SEX性高清播| 亚洲AV无码成人精品区毛片 | 人妻少妇乱子伦无码专区| 人妻少妇久久精品电影| 日韩精品极品视频在线观看免费| 色既是空在线观看| 天天狠天天透天干天天怕| 无人区码一码二码三码医生系列| 校花高潮抽搐冒白浆| 亚洲国产成人精品福利在线观看| 亚洲人妻在线视频| 伊人伊成久久人综合 成人| 最新国产精品亚洲|