Steel curtain wall construction and process all-glass structures

Time:[2015-12-16]  Hits:5862

Steel curtain wall construction and process all-glass structures

 

Installation of Guangzhou Steel full glass curtain wall is a multi-joint construction trades, the process is complex and requires very sophisticated operation also needs to act in harmony troops. At the same time it is closely linked with the progress of the construction plans of other sub-project. In order to make the construction and installation of steel curtain wall smoothly, it is necessary according to the actual situation of the project, preparation of a good individual construction organization design, and confirmed by the Guangzhou Steel general contracting units.

The first is the project started preparatory work

Technical data collection

Site civil engineering design data collection and civil structure size measurements. Because there may be some fluctuation civil construction, the actual size is not always in line with the design drawings. Full glass curtain wall to the higher civil structures related to the size requirements. So before the design is necessary to measure the site to obtain first-hand information and data. And then to draw realistic view of a curtain separates the requirements of owners. About gated entrance of the site, there is a need and making active revolving door, the unit with full glass door, the glass curtain wall on the door and the door of a reliable shut. But also it needs to meet the requirements of the installation and repair of active revolving door.

Design and construction program concluded

Design and construction programs conclude. When the design of the glass curtain wall separated, in addition to consideration of uniform aesthetic appearance, we must also pay attention to minimize the glass of standard models. Since all types of building outdoor design are different, to have a large outdoor canopy, driving ramps and other projects, more attention should coordinate the overall construction sequence and progress, to avoid the construction and other outdoor facilities, the impact of walking and glass curtain wall crane installation. Before the formal construction, the construction scale should also be flattened infill site, good site clean-up, to ensure the smooth running crane.

Another is to prepare materials and machinery equipment

The main material quality check

(1) glass is not the right dimensions, with particular attention to check the glass in storage, whether the damage during transport, a crack is found, glass chipping must not be installed and should immediately tell the factory as soon as possible supplementary reworked.

(2) the raw material metal structural member is not in line with the design requirements, members are not straight, processing size, accuracy, hole orientation is not meet the design requirements. To a good first anti-rust paint brush, all member number must be labeled clearly.

Main construction equipment inspection

(1) Glass lifting and transportation machinery and equipment inspection, especially for crane operating systems and electric chucks performance checks.

(2) performance check various power and hand tools.

(3) azimuth orientation and design of embedded parts of deviation should not exceed 20mm.

Scaffolding

Due to the different needs of the construction program, the construction scaffolding structures must meet different requirements.

(1) discharge line and production load-bearing steel frame, should be set up at both sides of the wall surface of the glass, to facilitate workers in different directions, such as welding and installation work carried out.

(2) When installing the glass curtain wall, should be set up inside the walls of. To facilitate the lifting obliquely inserted into the glass does not touch the scaffolding, but also make standing up and down in various parts of the scaffold workers can easily hold the hand sucker can assist crane glass exact place.

(3) the glass in place after dispensing and cleaning phase, then the need to build a separate row in the outdoor scaffolding, due to the large all-glass curtain wall continuous area, the outdoor scaffolding was unable to pull connected with the main structure, so pay special attention to scaffolding support and stable, can land anchors, cables and pillars with braces then pull. Construction height of each operator should lay out scaffold boards, top to have fences, scaffold boards use wire fixation. In the construction and dismantling of scaffolding to be extra careful not to throw the steel and fasteners throw down from a height, to avoid damage to the glass.

Then that is an important project: steel curtain wall installation.

Steel curtain wall installation steps roughly as follows:

1. actinomycetes positioning;

2. The upper part of the load-bearing steel structure installation;

3. The lower portion of the side frame installation;

4. glass in place.

5. Note sealant;

6. Surface cleaning and inspection;

After that is completed the conservation and repair

At present, all-glass curtain wall maintenance and repair of the owners have not been enough attention. Now the whole glass curtain wall material used has a certain validity, but also regular observation and maintenance in normal use, so inspection after the hand over, and use of best conservation and development of curtain wall repair plan, and signed a contract with the company.

That is more than the flow of steel construction and all-glass curtain wall structure.
Guangzhou Steel Steel] find [Katsukuni specializes in steel plants, steel canopy, steel warehouses, steel garages, steel structure workshop, steel buildings, steel villa, steel buildings, steel carports, Steel manufacturers .18900873268 Leung Shenzhen steel companies, steel manufacturers, Foshan, Guangzhou steel company, Dongguan Stadium and other steel company Steel steel structure design and steel construction, but also to find Katsukuni, ISO certification quality more guaranteed.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
狂躁美女BBBBBB视频| 黑人性狂欢在线播放| 亚洲成AV人片在线观看无线| 久久国产精品日本波多野结衣| 中文字幕高清免费日韩视频在线| 人妻AV综合天堂一区| 高清一区二区三区日本久| 亚洲AV无码一区二区二三区我| 久久久综合亚洲色一区二区三区| AV无码免费岛国动作片片段欣赏| 手机免费AV片在线播放| 精品成在人线AV无码免费看| 18禁超污无遮挡无码免费动态图| 日日噜噜夜夜狠狠久久蜜桃 | 欧美成人精品三级网站视频| 俄罗斯另类ZOZO| 亚洲AV综合色区无码专区蜜桃| 乱妇乱女熟妇熟女网站| 成 人 H动 漫在线播放日本| 亚洲 日韩 另类 制服 无码| 老头的大龟挺进秀婷小说| 成人福利国产午夜AV免费不卡在| 亚洲AV极品无码专区亚洲AV| 麻豆妓女爽爽一区二区三| 德国大8BW德国大8BW| 亚洲浮力影院久久久久久| 男生女生一起相差差差| 国产成人精品无码A区在线观看| 亚洲欧美VR色区| 欧州一级 片内射AV| 国产麻豆精品一区二区三区V视界| 又粗又大又爽又舒服日产| 揉大N呻吟水多大棒子| 精产国品一二三产品区别视频| 99久久婷婷国产综合精品| 无码国产69精品久久久孕妇| 巨爆乳无码视频在线观看| 粉嫩性色av一区二区三区| 亚洲人成色777777网站| 日本一线和三线的区别| 精品粉嫩BBWBBZBBW| 啊轻点灬大JI巴太粗熟妇| 亚洲AV无码一区二区三区大黄瓜| 欧美成人WWW免费全部网站| 国产精品无码综合区| 中文字幕人妻无码乱精品| 天堂资源中文WWW| 裸体跳舞XXXX裸体跳舞| 灌溉系统NPC游戏双男主| 亚洲中文字幕无码爆乳APP| 日韩人妻精品无码一区二区三区| 精品深夜AV无码一区二区| А√中文在线天堂| 亚洲顶级裸体AV片| 日本强伦姧熟睡人妻完整视频| 精品久久久久久国产潘金莲| 成人AV无码乱码在线观看无码| 亚洲免费成人av| 日日躁夜夜躁狠狠久久AV| 久久久久亚洲AV无码专区桃色 | 中文字幕乱码人妻无码久久| 玩弄少妇人妻中文字幕| 免费无码又爽又刺激高潮的动态图 | 香蕉AV福利精品导航| 男生把感叹号放进女生的括号| 国产亚洲成AV人片在线观看| ASSPICS亚洲美女裸体CHINESE| 亚洲AV无码片VR一区二区三区| 人妻丰满熟妇aⅴ无码HD| 精品无码国产自产拍在线观看蜜| 大香伊蕉人在播放2019| 在线观看亚洲AV每日更新| 无人区卡一卡二卡三乱码入口| 欧美成人精品高清视频| 饥渴老熟妇乱子伦视频| 成为全校公交车的日常生活| 尹人香蕉久久99天天拍| 午夜夫妻试看120国产| 欧美性猛交XXXX乱大交蜜桃| 久久99国产精品久久99蜜桃| 国产成人精品人人做人人爽| 97久久精品人人澡人人爽| 亚洲国产AV玩弄放荡人妇系列| 日韩AV无码久久一区二区| 久久永久免费人妻精品直播| 国产裸体XXXX视频在线播放 | 一本色道无码不卡在线观看| 无码99久热只有精品视频在线观| 欧美巨大XXXX做受高清| 久久国产精品成人片免费| 国产成人精品人人| TOUGHTESTED硬汉系列| 阳台顶着岳刘晓莉的肥臀| 无码一区二区三区久久精品| ASS少妇PICS粉嫩BBW| 亚洲AV永久无码老湿机男人网| 日韩欧美中文字幕看片你懂的| 免费A级毛片18禁网站APP| 饥渴老熟妇乱子在线播放| 国产chinese大学生Gay| JAPANESE日本护士XXX| 亚洲一区精品无码| 性色AⅤ一区二区三区天美传媒| 人善交VIDEO另类HD| 么公的粗大挺进了我的密道| 狠狠躁夜夜躁人人爽碰AV| 国产成人无码AV一区二区| 啊灬啊灬高潮来了…视频APP| 制服丝袜另类专区制服| 亚洲国产超清无码专区| 忘忧草社区在线影视| 日本高清在线观看视频WWW色| 免费人成在线观看网站免费观看| 精品久久久无码中文字幕一丶| 国产精品久久高潮呻吟无码| 成人日韩熟女高清视频一区| 97夜夜澡人人爽人人喊A| 亚洲综合色丁香婷婷六月图片| 亚洲AV无码AV日韩AV网站| 婷婷俺也去俺也去官网| 日本55丰满熟妇厨房伦| 女人与公拘交酡过程高清视频| 久久老司机精品网站福利| 极品国产主播粉嫩在线| 国产乱码卡二卡三卡43| 丰满熟妇乱又伦在线无码视频| ンピースのエロス在线WWW| 2022国产成人无码AⅤ片| 一本一本久久A久久综合精品蜜桃| 亚洲成A人片在线观看无遮挡| 无码精品视频一区二区三区| 色偷偷亚洲第一成人综合网址| 人妻激情偷乱频一区二区三区| 牛鞭进入女人下身的视频| 里面也请好好疼爱漫画最新章节| 精品少妇人妻AV免费久久洗澡 | 成人伊人亚洲人综合网| JIZZJIZZ国产在线观看| 236宅宅理论片免费| 呦系列视频一区二区三区| 亚洲线精品一区二区三八戒| 亚洲国产精品第一区二区| 亚洲AV无码国产精品久久| 西方38大但人文艺术| 挺进邻居人妻雪白的身体韩国电影 | 亚洲AV无码一区毛片AV| 香蕉久久人人爽人人爽人人片AV | ChineSe玩弄老年熟妇| 18一20亚洲GAY无套| 在C点用力把桌腿A抬离地面时游| 亚洲熟妇色自偷自拍另类| 亚洲精品无码专区在线| 亚洲丰满性熟妇ⅩXXOOO| 亚洲AV无码一区二区三区网站| 亚洲2022国产成人精品无码区| 无码专区无码专区视频网址| 玩小雪跪趴把腿分到最大影视频| 施主就让贫僧C进去吧| 少妇人妻好深好紧精品无码| 日韩乱码人妻无码中文字幕| 日韩AV无码午夜免费福利制服| 日本高清色WWW在线安全| 人人狠狠综合久久亚洲婷婷| 人妻人人添人妻人人爱| 人妻被修空调在夫面侵犯| 人和畜禽CROPROATION| 人妻丰满熟妇AV无码区免| 人妻互换免费中文字幕| 人人爽天天碰狠狠添| 日韩A级成人免费无码视频| 三级4级全黄60分钟| 少妇性活BBBBBBBBB四川| 天堂√最新版中文在线天堂| 偷看自己婆给别人玩经过| 无码人妻AV一区二区三区蜜臀| 无码少妇一区二区浪潮AV| 性XXXX视频播放免费| 亚洲AV无码乱码| 亚洲精华液一二三产区| 亚洲人成网7777777国产| 夜里18款禁用软件APP| 宅男666在线永久免费观看| 18禁黄网站禁片免费观看女女| AA级女人大片喷水视频免费| 锕锕锕锕锕锕好痛WWW在线观看| 成 人 黄 色 视 频网址大全| 多毛熟女HDVIDOS| 国产精品国产免费无码专区蜜桃| 国产日韩AV免费无码一区二区| 国产自国产自愉自愉免费24区| 黑人与亚洲美女ⅩXXX| 久久99精品国产麻豆宅宅| 久久综合婷婷成人网站| 男生坤坤放在女生坤坤叫什么| 破外女出血视频全过程| 日韩人妻无码视频| 无码少妇xxxx| 亚洲精品无码你懂的网站| 一本久久A久久精品综合| 2022国产在线无码精品|