Guangzhou Steel tells you: assess Steel Works Welding Technology

Time:[2015-8-1]  Hits:4701

Guangzhou Steel tells you: assess Steel Works Welding Technology


1, the construction unit for the first time use of steel, welding materials, welding, joint type, welding position, post-weld heat treatment, a combination of various parameters and parameters should be in front of steel structure fabrication and installation of welding procedure qualification test. Welding procedure qualification test methods and requirements, and exempt from restrictions assessment process should be consistent with existing national standards "Steel Welding Code" GB 50661 of the relevant provisions.
2, before welding construction, the construction unit should be qualified welding procedure qualification results or used in line with the conditions for the exemption procedure qualification basis, the preparation of the welding process documents, and should include the following:
(1) a combination of welding or soldering method;
(2) the base material specifications, grade, thickness and coverage;
(3) the filler metal specification, category and type;
(4) The form of welding joints, bevel form, size and tolerance;
(5) welding position;
Species (6) welding power source and polarity;
(7) clean-treatment;
(8) welding parameters (welding current, welding voltage, welding speed, welding layer and bead distribution);
(9) road between preheating temperature and temperature range;
(10) post-weld stress relief treatment process;
(11) other necessary requirements.
Ⅱ welding work conditions
3, welding, operation area ambient temperature, relative humidity and wind speed should meet the following requirements when the provisions of this article and must be welded beyond, shall prepare special programs:
(1) Operating ambient temperature is not lower than -10 ℃;
(2) Relative humidity welding work area shall not be greater than 90%;
(3) When the SMAW and self-shielded flux-cored arc welding, welding work area shall not exceed the maximum wind speed 8m / s, when the gas shielded arc welding work area shall not exceed the maximum wind speed 2m / s.
4, site altitude welding job should secure operating platform and puts up protective shed.
5, prior to welding, wire brush should be used, wheel and other tools to remove oxide surfaces to be welded at the rust, oil and other debris, weld groove should be according to the current national standard "Steel Welding Code" GB 50661 of the relevant provisions were an examination.
6, welding parameters welding procedure qualification of the job should be.
7, when the welding operation at ambient temperatures below 0 ℃ and not lower than -10 ℃, heating or protective measures should be taken, should be welded joints and welding surface in each direction is greater than or equal to 2 times the plate thickness within the range of not less than 100mm The base material is heated to a predetermined minimum preheat temperature not lower than 20 ℃ before welding.
Ⅲ tacking
8, positioning weld thickness of not less than 3mm, should not exceed 2/3 of the design throat thickness; length less than 40mm and joints four times the thickness of the thinner parts; spacing is preferably 300mm ~ 600mm.
9, positioning the weld seam with the official should have the same welding process and weld quality requirements. Multi-channel positioning weld ends should be stepped. Use of welded joints of steel liner plate, tack welds should be carried out within the joint groove. Positioning welding preheat temperature should be higher than the official welding preheat temperature 20 ℃ ~ 50 ℃.
Ⅳ arc plate, lead plate and spacer plate
10, when the arc plate, lead plate and spacer plate when the steel should be used in the yield strength of the steel is not greater than the nominal strength steel welding and welding should be similar.
11, the ends of welded joints should be set arc weld plate, lead plate. Arc welding and gas shielded arc welding lead length should be greater than 25mm, submerged arc welding seam lead length should be greater than 80mm. Welding is completed and fully cooled, can be flame cutting, carbon arc gouging or mechanical methods such as removing the arc plate , leads to the plate and be grinding smooth. Do not use a hammer shot down.
12, steel liner plate should be snug fitting connection with the base material, the gap should not be greater than 1.5mm, and should be fully weld fusion. When manual arc welding and gas shielded arc welding, steel liner plate thickness of not less than 4mm; when submerged arc welding, steel liner plate thickness of not less than 6mm; electroslag welding steel liner plate thickness of not less than 25mm.
Ⅴ preheat and interpass temperature control
13, preheat and channel temperature control should be used electric heating, flame heating and infrared heating and other heating methods, and should be dedicated thermometer measurements. Heating area should be preheated welding groove on both sides, the width should be the thickness of weldment welding at least 1.5 times, and should not be less than 100mm. Temperature measurement point, when a non-member enclosed space, preferably in the weldment the back of the heating surface of the weld groove from both sides at no less than 75mm; when the member is a closed space, preferably in the front side from the weld groove at not less than 100mm.
14, preheat temperature of welded joints and track temperatures should be consistent with current national standard "Steel Welding Code" GB 50661 of the relevant provisions; when the process of selection of the preheating temperature is lower than the current national standard "Steel Welding Code" GB 50661 The relevant provisions, should be determined by the procedure qualification test.
Welding deformation control Ⅵ
15, welding technology and welding sequence used should be minimal deformation and contraction member, Guangzhou steel welding sequence can be used to control the deformation of the following:
(1) butt joints, T-joints and cross joints, in the case of component placement conditions allow or easily reversed, should be double-sided symmetrical welding; symmetrical cross-section of members, should be symmetrical to the member neutral axis welding; symmetrical connecting rods node element, the node should be symmetrical axis of symmetry while welding;
(2) double-sided asymmetric groove welds are advised deep groove weld seam side part, then weld groove side full of light, to finalize the deep groove side seam. Special plate should increase rotation symmetrical weld cycles;
(3) long seam welding method should be used back-step, jump or more symmetrical welding method welding;
16, when members of a welding, soldering reserve should adopt anti-shrinking margin or pre-deformation method of controlling shrinkage and deformation, shrinking margins and anti-deformation value should be determined by calculation or test.
17, when the member assembly welding, weld shrinkage should be larger joints, a small amount of shrinkage after welding joints, welding joints shall be binding in smaller states.
Ⅶ stress relieved after welding
18, design documents or the contract documents after welding eliminate the stress required and be subjected to tensile stress in the butt joints or welds concentration of nodes or components by fatigue check the structure, should adopt the electric heater and partial annealing furnace annealing overall and other methods of stress relieving; when only stable structure size, vibration method can be used to eliminate stress.
19, the heat treatment should be consistent with the current industry standard "carbon steel, low alloy steel weld heat treatment after welding member," the relevant provisions of JB / T 6046 after welding. When using an electric heater for welding components for local stress relief heat treatment shall meet the following requirements:
(1) is equipped with automatic temperature controller heating equipment, heating, temperature, temperature control performance should be consistent with the requirements;
(2) Each side seam heater board member (band) width should be at least 3 times the plate thickness, and not less than 200mm;
Both sides of the member (3) An heating plate (with) suitably covered with insulating material.
20, with a hammer method to eliminate intermediate solder layer stress, you should use a hammer or a small round vibrating hand tools, should not be the root of the weld, the weld cap weld or bevel edge of the base material hammer.
21, using the vibration method to eliminate stress, vibration aging process parameters and technical requirements should be consistent with current industry standard "welded components VSR process parameters and technical requirements" JB / T 10375 of the relevant provisions. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
成人国产一区二区三区| 99在线精品免费视频九九视| 欧美成人精品视频一区二区三区| 伴郎粗大的内捧猛烈进出视频观看 | 精品无码AV一区二区三区少妇| 亚洲精品自偷自拍无码| 免费看又黄又爽又猛的视频| 厨房人妻HD中文字幕69XX| 亚瑟国产精品久久| 美女把尿口扒开让男人桶| 被带到调教室刑床惩罚挠痒痒作文| 无码中文AV有码中文AV| 久久婷婷五月综合色和啪| 北条麻妃在线一区二区| 亚洲6080YY久久无码产自国| 麻豆丰满少妇CHINESE| 丁香花在线视频完整版| 亚洲国产AV无码精品| 欧美V国产V亚洲V日韩九九| 国产成人精品一区二三区| 亚洲色精品一区二区三AI女星 | 亚洲乱码国产乱码精品精姦| 欧美乱大交XXXXX性喷潮 | А√天堂资源地址在线下载 | 大战丰满无码人妻50P免费| 亚洲成A人片在线观看无码不卡| 免费高清曰韩仑理| 国产成人果冻星空传媒| 亚洲色国产欧美日韩| 人人妻人人妻人人片AV| 国内精品自产拍在线观看| 4399理论片午午伦夜理片| 四虎亚洲精品成人A在线观看| 久久99国产精品久久99软件| 爱丫爱丫影院在线观看免费| 亚洲AV无码成人精品区蜜桃| 欧美成人家庭影院| 国产乱人伦偷精品视频下| 中文字幕JUL975老公不在| 少妇无力反抗慢慢张开双腿| 久久久久久AV无码免费网站下载 | 做AJ姿势教程大全图片| 翁止熄痒苏钥第9章的内容| 久久久综合亚洲色一区二区三区| 成人毛片18女人毛片免费| 亚洲欧美精品伊人久久| 日产精品久久久久久久| 久久国产精品久久久久久| 成熟妇女性成熟满足视频| 亚洲欧洲日韩综合色天使| 日韩乱码人妻无码中文字幕久久| 久久97超碰色中文字幕总站| 出差被绝伦上司侵犯中文字幕| 亚洲欧洲日韩综合色天使| 日产乱码一二三区别免费影视| 久久国产午夜精品理论片| 大屁股熟女白浆一区二区| 亚洲综合AV永久无码精品一区二 | 欧美最猛性XXXXX黑人巨| 黑人巨鞭大战丰满少妇| YY111111少妇影院无码| 亚洲欧美日韩综合久久| 三级无码在钱AV无码在钱| 久久一本加勒比波多野结衣| 国产精产国品一二三产区区别| 综合激情丁香久久狠狠| 亚洲AV色香蕉一区二区| 任你躁X7X7X7X7在线观看| 久久精品国产亚洲AV无码偷窥| 岛国精品一区免费视频在线| 伊人久久大香线蕉午夜AV| 无码人妻精品一区二区在线视频| 欧美JIZZ18性欧美| 狠狠躁夜夜躁青青草原软件| 成人影院YY111111在线观| 影音先锋人妻啪啪AV资源网站| 无人高清视频完整版在线观看 | 玉蒲团之玉女心经| 校花娇喘呻吟校长陈若雪视频| 强CAO出水嗯啊高潮了H漫画| 久久九九久精品国产免费直播| 国产激情大臿免费视频| JAPANESE极品少妇| 亚洲无人区一码二码三码区别| 未满十八18禁止免费无码网站 | 麻豆精品传媒一二三区艾秋| 国产一卡2卡3卡4卡无卡国色| 超级YIN荡的公司聚会| 再深点灬舒服灬太大了添A| 无码中文AV波多野结衣| 日本JAPANESE猛男GAY| 老头霸占人妻中文字幕| 国内自产少妇自拍区免费 | 97国语精品自产拍在线观看一| 亚洲精品自偷自拍无码| 窝窝人体色WWW聚色窝魅惑| 人妻av一区二区三区精品| 久久无码人妻丰满熟妇区毛片| 国产无遮挡又黄又爽不要VIP网| 成 人 A V天堂| 中文字幕在线播放| 亚洲欧洲日产国码无码APP| 无码国产精成人午夜视频一区二区 | 国产肉体XXXX裸体784大胆| YY影院电视剧大全| 野花影视视频在线观看免费| 性色AV性色生活片| 上课忘穿内裤被老师摸到高潮| 欧美极品少妇做受| 久久天天躁狠狠躁夜夜躁2014| 韩日午夜在线资源一区二区| 国产成人无码区免费AⅤ片| 俺去俺来也在线WWW色官网| 在线播放国产精品三级网| 亚洲国产综合精品 在线 一区 | 日韩人妻无码视频| 欧美极品少妇XXXXⅩ喷水| 久久亚洲中文字幕无码| 极品新婚夜少妇真紧| 国产欧美精品一区AⅤ影院| 父母儿女一家换着玩的文案 | 在线观看AV网站永久免费观看| 亚洲国产成人久久综合电影| 无码性午夜视频在线观看| 日韩成人av网站| 人成乱码一卡二卡三四卡五卡六卡| 蜜桃人妻无码AⅤ中文字幕| 久久精品国产久精国产果冻传媒| 国产又爽又粗又猛的视频 | 吧唧吧唧吧唧一口一口吃掉了| 重生之玩遍娱乐圈全文阅读| 一本无码字幕在钱少妇人妻| 亚洲精品无码专区| 亚洲AV无码精品色午夜在线观看| 我和公发生了性关系公| 少妇高潮太爽了在线观看欧美| 日本漂亮妈妈7在观有限中子 | 久久无码精品一区二区三区| 精品久久久无码人妻中文字幕| 国内精品综合久久久40P| 国产欧美久久久精品影院| 国产成人片一区在线观看| 大肉大捧一进一出的视频| 被黑人猛烈30分钟视频| WWW射我里面在线观看| BBWBBW欧美肥妇PICS| 中文字幕精品亚洲无线码一区应用| 野花韩国高清免费视频6| 亚洲日韩成人无码不卡| 亚洲男人的天堂在线播放 | 国产成人愉拍免费视频| 国产99网站免在线观看| 丰满熟妇乱又伦精品| 大地琪琪网在线观看| 吃瓜爆料黑料网站| 从今天开始当城主| 厨房掀起裙子从后面进去视频| 成年免费A级毛片无码| 爆乳女教师 高清BD| 办公室双腿打开揉弄高潮淑芬| YY1111111少妇影院光屁| Xx性欧美肥妇精品久久久久久久久 | 亚洲AV成人综合网久久成人| 无码人妻久久一区二区三区不卡| 铜铜铜铜铜铜铜铜铜好多深| 熟妇啊轻点灬大JI巴太粗| 深入浅出TXL金银花讲的什么| 熟妇人妻一区二区三区四区| 天天做天天摸天天爽天天爱| 推油少妇久久99久久99久久| 无码精品人妻一区二区三区涩爱| 无码少妇一区二区浪潮av| 午夜精品久久久久久久99热| 亚洲AV成人无码一区在线观看| 亚洲AV色香蕉一区二区三区夜夜嗨| 亚洲AV无码不卡在线播放| 亚洲国产精久久久久久久| 亚洲人成绝费网站色WWW吃脚| 亚洲色欲综合天堂亚洲| 伊人久久大香线蕉AV色| 最新中文字幕AV专区| ALEXAGRACE大战黑人| 饱满的乳被揉捏玩弄| 丁香婷婷在线成人播放视频| 国产GAYSEXCHINA男同| 国产乱妇乱子在线播视频播放网站 | A级毛片内射免费视频| X姓女RAPPER| 俄罗斯VIDEODESEXO极| 国产成人亚洲精品无码MP4| 国产免费AV片在线播放| 皇上太长了撞到点了| 久久久久久精品毛片A级蜜桃| 里番本子纯肉侵犯肉全彩无码| 女女互揉吃奶揉到高潮视频| 青青草国产精品亚洲专区无码| 日韩一区二区三区无码人妻视频| 天天AV天天翘天天综合网色鬼| 性色AⅤ一二三天美传媒 | 无码人妻精品一区二区三|